AV installers
AV installation software that follows the job onto site
For an installation company the design is only worth what the crew can build from it. The margin lives in the bill of materials being right, the cable being ordered to length, the right people being on site the right week, and the snag list actually getting closed.
Qué hace diferente a av installers
A wrong BOM is a second van trip
If the bill of materials does not reconcile against the design, the missing bracket is found on site, and the fix is a return visit that eats the margin on the job.
Cable ordered by guess
Estimating drum lengths off a hunch either over-orders or sends the crew back through closed containment. Lengths have to come off the routed path on the plan.
The install is the last thing anyone plans
Who is on which site, for how long, with what pre-built, is usually a whiteboard. When it slips, everything downstream slips with it.
Lo que usas para ello
Una lista de materiales que cuadra
La lista de materiales fusiona plano, racks y presupuesto en una sola relación y marca cada desajuste: dibujado pero no presupuestado, presupuestado pero no colocado, cantidades que no coinciden. Compárala con cualquier revisión anterior.
Tiradas de cable con longitudes reales
Traza el cableado por las canalizaciones y Avitly calcula la longitud real: el recorrido horizontal, la holgura y la bajada vertical que una vista cenital no muestra. Precio por metro, con aviso por tipo de cable en cuanto superas la longitud máxima.
Seguimiento de la instalación
Una vez firmada la propuesta, controla qué está montado, qué queda y en qué punto está cada proyecto, para que el traspaso a posventa sea limpio.
Planificación de equipos
Planifica a tus instaladores en todos los proyectos, para que la gente adecuada esté el día adecuado en el emplazamiento adecuado. Mira quién está libre, quién está duplicado y qué necesita cada obra.
Diseña sobre el plano de planta real
Importa el plano, calíbralo a escala real y coloca cada equipo. Los contornos DXF del fabricante dibujan el material a su tamaño real, así que la distribución coincide con lo que acaba instalado.
Control de horas y tarifas
Imputa horas a un proyecto, a un plano o a una línea concreta, con tarifas por defecto por usuario y por rol. Las horas facturables pasan a la factura como líneas reales, así que la mano de obra que echas es la mano de obra que cobras.
The bill of materials reconciles against the design before anything ships, cable comes off the routed lengths, and the crew checks each item off on site against the same plan the designer drew. Nothing is retyped between the office and the van.
Otros espacios para los que trabajamos
Broadcast
Design studio and OB broadcast systems on one model: signal-flow diagrams that catch a wrong connector, dense rack elevations, redundant paths, and a device record that survives the next rebuild.
IT integrators
Plan network and low-voltage installs on one model: rack elevations, PoE and structured cabling, device credentials, config files, and API access to the record you build.
System integrators
One system for the whole integration business: design, quote with live margin, send signed offers, hand installers the build, and keep service records, without re-entry between tools.
Diséñalo una vez. Véndelo, instálalo, mantenlo.
Avitly lleva toda la instalación desde un único plano de planta: presupuesto, aceptación firmada por el cliente, lista de materiales, montaje de rack y, tras la entrega, las credenciales de los equipos y los tickets. Del presupuesto al mantenimiento, sin volver a teclear nada.
Prueba Avitly gratisSin tarjeta de crédito.
O habla con ventas
