Blog

News, tips, and product updates

How AV and IT integrators plan, quote, and close more work with Avitly.

ComparisonD ToolsBuying Guide

D-Tools alternatives: an honest shortlist for AV integrators

D-Tools is still the benchmark for large engineered jobs. If the desktop-plus-server setup, the two-product hand-off or the quote-only pricing is your problem, here are the alternatives worth a demo, and when to stay put.

Avitly28 July 20267 min read
NetworkDesignAv Over Ip

Subnetting for AV-over-IP networks, a practical primer

AV-over-IP puts video, audio, control and management on the same wire. Without a subnet plan they fight. A little addressing discipline up front keeps multicast contained and the system predictable.

Avitly22 July 20263 min read
Floor PlansDrawingsWorkflow

Reading DXF floor plans without a CAD seat

The architect sends a DXF and half the team cannot open it. You do not need a CAD licence to read a plan, measure a run or check a dimension. You need the drawing and the right view.

Avitly21 July 20263 min read
PlatformWorkflowService

One record from site survey to year-three service call

Integrators lose the thread at every handoff. Keeping the whole AV job in one record, design to maintenance, ends the re-keying and the lost credentials.

Avitly21 July 20262 min read
VideoDesignEstimating

Projector throw distance and screen sizing, done right

Throw ratio, room depth and screen size are one equation with three unknowns. Fix two and the third is decided. Get it wrong and you order a lens that does not fit the room.

Avitly19 July 20263 min read
Bill Of MaterialsInstall

The reconciling bill of materials for AV installs

Drawn but not quoted, quoted but not racked: those gaps cost you on site. A reconciling bill of materials flags every mismatch across plan, racks, and quote.

Avitly19 July 20263 min read
PowerNetworkEstimating

PoE power budgeting for cameras, displays and access devices

A PoE switch has two limits, per-port and total budget, and the total is the one that bites. Add up the real draw before you hang the devices, not after half of them refuse to power up.

Avitly17 July 20263 min read
Rack LayoutDesign

Planning AV rack elevations in U before install day

A rack that does not fit is discovered on site, at the worst possible time. Plan AV rack elevations in U with collision detection so every unit has its place first.

Avitly16 July 20262 min read
CablingPowerEstimating

Calculating voltage drop for AV and security cable runs

A long low-voltage run does not fail cleanly. It browns out a camera at night or dims a display, and the fault looks intermittent. Size the conductor for voltage drop up front and the symptom never appears.

Avitly15 July 20263 min read
RacksDesignBest Practices

Rack elevation best practices: airflow and service access

A rack elevation is not a stacking puzzle. Plan for airflow, weight, service access and power before you screw in the first U, and the install goes in once instead of twice.

Avitly13 July 20263 min read
EstimatingFloor PlansCabling

Estimating true cable lengths before you pull a single run

Guessing cable footage quietly kills margin. Get true cable lengths with slack and vertical drop, straight from a calibrated floor plan, before anyone climbs a ladder.

Avitly13 July 20262 min read
QuotingFloor PlansSales

How to quote an AV installation straight off the floor plan

Stop rebuilding quotes in a spreadsheet. Price an AV installation directly from the floor plan, with live margin on every line and nothing left off.

Avitly10 July 20263 min read