Built for AV & IT integrators

Design it once.
Sell it, install it, service it.

Avitly runs the whole AV and IT install off one floor plan: quote, client-signed offer, bill of materials, rack layout, then device credentials and tickets after handover. Presales to maintenance, no re-entry.

No credit card needed.

Built in The Netherlands EU-hosted, GDPR-compliant
Wiring faults caught on screen
Quotes straight off the plan
Interactive offers, not PDFs
No spreadsheets, no re-keying
app.avitly.com/floor-plans
Avitly floor plan editor: SPL coverage heatmap over a restaurant plan with speakers, cable runs, and measured lengths

70+

Connector types validated

5

Signal types checked per port

1

Record from first site visit to service call

Everything from survey to signed, in one platform

Interactive floor plansConnector & signal validationTrue cable lengthsReconciling bill of materialsRack elevationsBranded interactive offersAPI & MCP serverInteractive floor plansConnector & signal validationTrue cable lengthsReconciling bill of materialsRack elevationsBranded interactive offersAPI & MCP server

Why integrators switch

One system beats a stack of tools.

Most integrators run a job across a CRM, spreadsheets, and a pile of PDFs, re-typing the same data at every handoff. Avitly keeps the whole job in one record, so the design you draw once carries all the way to the year-three service call.

The old way

  • The whole job

    Split across a CRM, spreadsheets, and a folder of PDFs

  • Every handoff

    Re-typed from sales tool to project tool to service tool

  • Pricing

    Retyped into a spreadsheet, drifting from the design

  • Bill of materials

    Hand-counted, easy to miss a drawn-but-unquoted item

  • The proposal

    A static PDF that ages the moment you send it

  • After handover

    Credentials and configs lost in someone’s inbox

With Avitly

  • The whole job

    One record from first site visit to year-three service call

  • Every handoff

    Design flows into quote, install, and service, nothing re-keyed

  • Pricing

    Generated from the plan, with live margin on every line

  • Bill of materials

    Reconciled across plan, racks, and quote, gaps flagged

  • The proposal

    An interactive offer accepted online, recorded with a timestamp

  • After handover

    Credentials, configs, and tickets stay on the project for years

How it works

One record, from first plan to year three

Design, Sales, Planning, Service: four of the six modules, all working off the same project, so nothing is re-typed at a handoff. Click through what each one does.

Design

Design the whole system on the plan

The floor plan is the source of truth. Calibrate it to true scale, place every device at its real DXF footprint, lay out racks, and route cabling that knows its real length. Racks, wiring, and coverage all hang off the plan, not a spreadsheet.

app.avitly.com/projects/8f2a1c/floor-plans
Floor plans in Avitly

Sales

Quote off that design, sign it online

The quote is generated from the placements, with live margin on every line. It goes out as one branded link the client explores and accepts online, not a static PDF, so you know the moment it lands.

app.avitly.com/quotes/QOT-004
Quotes with live margin in Avitly

Planning

Get the right people on the right site

The signed offer becomes work with dates on it. Phases run on one Gantt, the crew is booked against real availability, and the hours logged on site come back as billable lines instead of a guess at the end of the month.

app.avitly.com/projects/8f2a1c/timeline
Project timeline in Avitly

Service

Still your job in year three

After handover the same record carries device credentials, installed-unit history, and aftersales tickets and RMA. Years later you still know exactly what is on that wall and how to log into it.

app.avitly.com/projects/8f2a1c/tickets
Tickets & RMA in Avitly

Open platform

Ask your AI client about your projects

Avitly ships an MCP server and a REST API, so the job data does not stay locked in one window. Connect an AI client straight to your organisation, or script against it yourself.

MCP server
Point Claude or any MCP client at your organisation and ask it about real projects.
REST API
Script against the same data if you would rather write the integration yourself.
One personal key
Granted per feature, read or write, revocable at any time.
Never above your role
A key cannot reach anything its owner could not already open in the app.
Connected over MCP
Which accepted quotes from last month have no purchase order yet?
Three. Bellevue Hotel, Sint-Jan College, and Harbour Offices.
Draft the orders per supplier for the Bellevue one.

Illustrative. What a key can read or write is set per feature and never exceeds its owner’s role.

Design it once. Sell it, install it, service it.

Avitly runs the whole install off one floor plan: quote, client-signed offer, bill of materials, rack layout, then device credentials and tickets after handover. Presales to maintenance, no re-entry.

Try Avitly free

No credit card needed.

Or talk to sales